Finned evaporator operation process
Leave a message
The installation of the finned evaporator needs to be strictly in accordance with the operating process, otherwise it will cause damage to the plate heat exchanger, which will affect the realization of the heat transfer effect. Finned evaporator installation mainly has the following points:
1, the user can be based on the installation size and equipment weight.
2, if the evaporator works above 100C, the pipeline connection should have thermal stress expansion absorption compensation device.
3, the evaporator should be installed vertically. When hoisting, pay attention to the center of gravity of the equipment, use the hoisting hole, you can use the guide rod to lift. It can also be flat, and the installation site should have enough space for maintenance.
4, for special circumstances allow tilt device, but must be fixed
5, assembly pipe: before piping should first check whether the evaporator is clamped to the specified clamping to the size range, if not clamped, first tighten to the specified size. To allow for easy maintenance, the base generator is connected to the pipe with a sub. Pressure gauges and thermometers should be installed in the inlet and outlet of cold and hot media. Generally, an air relief valve should be provided on the pipe connecting the upper corner hole. If the sewage is used as a cooling medium or the waste heat of the recovered sewage or the medium contains granular solids, the appropriate type of automatic discharge filter or deconsolver should be installed upstream of the evaporator inlet end to avoid clogging the evaporator. When the possible large pressure of the medium is greater than the high use pressure of the equipment, a pressure reducing valve and a safety valve should be installed at the entrance of the equipment.